** Specify parameters for the ''<IS_TS id=strAutomatykaOP/>''.<br/>[[File:ISmart Manifolds.png |900 px|left|thumb|9.<IS_TS id=InstalacjeCieplne/> / <IS_TS id=SystemyPlaszczyznowe/> / <IS_TS id=RozdzielaczeSystemowPlaszczyznowychIAutomatyka/>.]]<br clear="all"/>
** Specify parameters for the ''<IS_TS id=strAutomatykaOP/>''.<br/>[[File:ISmart Manifolds.png |900 px|left|thumb|9.<IS_TS id=InstalacjeCieplne/> / <IS_TS id=SystemyPlaszczyznowe/> / <IS_TS id=RozdzielaczeSystemowPlaszczyznowychIAutomatyka/>.]]<br clear="all"/>
===Editing the installation and its data===
====Editing the installation and its data====
====Editing the installation structure====
* Insert sanitary appliances, if these were not included in the file, e.g. from a previously completed design of water supply system {{Info}} [[Designing of water supply system installation#Editing sanitary installation|Editing sanitary installation]].
* Insert ''<IS_TS id=PionKanalizacji/>'' elements and complete their essential data in the ''<IS_TS id=DataEditorTable/>'' window:
** Depending on the purpose of the ''<IS_TS id=PionKanalizacji/>'' element, declare the proper type in the ''<IS_TS id=typyWlaczenWPionie/>'' field. Define additional parameters for double stacks (''<IS_TS id=strKanalizacjaSanitarna/>'' + ''<IS_TS id=strKanalizacjaWentylacja/>''): ''<IS_TS id=strOdstepOsiRur/>'', ''<IS_TS id=AutomatyczneTworzenieWentylacjiObejsciowej/>'' checkbox selection.
** In the ''<IS_TS id=EndOfSewerageLine/>'' field, define the way in which the pipe-run at the last storey for the ''<IS_TS id=PionKanalizacji/>'' element finishes:
*** For the waste stack, it is necessary to choose the vent element (e.g. ''<IS_TS id=pinNameRuraWywiewna/>''), leaving the ''<IS_TS id=ZakonczeniePionuBrak/>'' option selected means that a vent manifold should be added in future,
*** The vent ''<IS_TS id=PionKanalizacji/>'' should be ended with a vent element, or it should be connected to the drainage stack.
** In the ''<IS_TS id=pcstrXY/>'' section, declare the range of storeys of the ''<IS_TS id=PionKanalizacji/>''.
** Perform the necessary steps to create ''<IS_TS id=PionKanalizacji/>'' element with a deviation (different XY coordinates on diferrent storeys). {{Info}} [[Connecting storeys with the Riser (Stack) element#Creating Drainage stacks with deviation|Creating Drainage stacks with deviation]].
* In many cases of bypass ventilation the internal structure of stacks should be changed. This is achieved by modifying stack data: types of pipes inside, declaration of elements on the top, declaration of internal connections, etc. The type of the stack is indicated in the ''<IS_TS id=DataEditorTable/>''.<br/>[[File:Bypass ventilation location.png|900 px|left|thumb|5. <IS_TS id=typyWlaczenWPionie/>.]]<br clear="all"/>All necessary points should be specified. Some geometrical data (distances between internal connections) have default values, but these may not fit all cases and often require manual correction after observing the 3D model.<br/>For the''<IS_TS id=PionKanalizacji/>'' elements with bypass ventilation (with selected checkbox ''<IS_TS id=AutomatyczneTworzenieWentylacjiObejsciowej/>'' in the ''<IS_TS id=DataEditorTable/>'' element window), verify and, if needed, change the following parameters:
** Select the ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' checkbox,
** Set the value in the ''<IS_TS id=OdlegloscOdStropuLacznikaWentKan/>'' field,
** Change the value in the ''<IS_TS id=RzednaDolnegoWlaczeniaWentDoKan/>'' field,
** (Optional) declare a number > 0 in the ''<IS_TS id=LiczbaKondygnacjiZDodatkowymPionemKan/>'' field (counting from the lowest storey).<br/>[[File:Parallel_vent.png|900 px|left|thumb|6. <IS_TS id=AutomatyczneTworzenieWentylacjiObejsciowej/>.]]<br clear="all"/>The program provides several schemes of bypass ventilation. Please note, that all changes inside the stack can be achieved only by changing stack data (no graphical edition possible). After drawing and connecting a ventilation pipe-run to a sewage pipe-run, manual correction of the elevations may be necessary.<br/>Sample files with different schemes of bypass ventilation you can find in the article [[Sewage installations - Bypass ventilation]]
* Insert the ''<IS_TS id=iNameSanUjscieSciekowSanitarnych/>'' and verify its position in the model,
* Connect the appliances with the ''<IS_TS id=PionKanalizacji/>'' using the ''<IS_TS id=iNameDzialka/>'' components. '''''ATTENTION! In the drainage system this component always consists of a single section.''''' If, for perpendicular connections, other than 90-degree branch fittings are needed, they should be declared in the ''<IS_TS id=rsDanogi/>'' window in the ''<IS_TS id=DaneInstalacjiRozprowadzajacejCzynnikGrzewczyChlodniczy/>'' tab in the ''<IS_TS id=DomyslnySposobLaczeniaDzialek/>'' section, and connections of ''<IS_TS id=iNameSanDzialkaKanalizacjiSanitGraw/>'' elements should be drawn as perpendicular (do not use "chamfering" in the plan view).
* In cases where a ''<IS_TS id=iNameDzialka/>'' should be connected on an elevation different than the default, change ''<IS_TS id=strOdlegloscOdPodlogiWlaczeniaDoPionuMethod/>'' to ''<IS_TS id=sOdlegloscOdPodlogiWlaczeniaDoPionuMethodPrzezUsera/>'', then set manually the required value of ''<IS_TS id=sOdlegloscOdPodlogiWlaczeniaDoPionuCaption/>''. <br/>'''''Note:''''' We recommend to define the value of ''<IS_TS id=DistanceConnectionFromFloorInWall/>'' to be used by default in the ''<IS_TS id=rsDanogi/>'' window for the usually lowest connection (e.g. for a ''<IS_TS id=iNameUstep/>'') and set it manually for the others.<br/>[[File:Method of declaring.png|900 px|left|thumb|7. <IS_TS id=strOdlegloscOdPodlogiWlaczeniaDoPionuMethod/>.]]<br clear="all"/>
* On the storey where ''<IS_TS id=iNameSanUjscieSciekowSanitarnych/>'' is placed, connect it with the ''<IS_TS id=PionKanalizacji/>'', to form the sewer collector network. The elevation of the beginning of this network is adjusted to the value of ''<IS_TS id=strOdlegloscOdGornegoStropuSiecOdplywowaSymbol/>''. If the elevation of ''<IS_TS id=iNameSanUjscieSciekowSanitarnych/>'' has been set manually, and is lower than the minimum required to achieve the gradients, the program may generate additional vertical pipe-runs.
* If the layout of the rooms is the same on each floor, copy repetitive parts of the installation to other storeys using ''<IS_TS id=InstallationCopyOnStoreyUp/>'' or ''<IS_TS id=InstallationCopyOnManyStoreys/>'' function.<br/>{{#ev:youtube|dgQlzO_mtmA|900||||rel=0}}<br/>
* Insert necessary ''<IS_TS id=ctgstringArmaturaCOSAN/>'' in the ''<IS_TS id=GraphicalEdit/>'' or on the ''<IS_TS id=View3D/>'', these may be elements such as ''<IS_TS id=pinNameObejscie/>'', ''<IS_TS id=pinNameZaworZwrotnyBezFekalii/>'', ''<IS_TS id=pinNameRewizja/>'' and similiar.<br/>Set the ''<IS_TS id=stringTypElementu/>'' from available catalogues and, if necessary, adjust the ''<IS_TS id=KatObrotu/>''.<br/><br/>{{#ev:youtube|JZyW0VNTofo|900||||rel=0}}
====Verifying the correctness of the installation structure.====
====Verifying the correctness of the installation structure====
* Verify the correctness of the connections of the installation components using the ''<IS_TS id=btCheckFlow/>'' function (Shortcut: Shift + F2).
'''''Note:''''' To avoid unnecessary short vertical sections, increase the ''<IS_TS id=strMaxSlopeCaption/>'' of the adjacent horizontal section. {{#ev:youtube|k0rTj0OvX5A|900||||rel=0}} <br clear="all"/>
* Verify the correctness of the installation structure and detect collisions with other systems using the ''<IS_TS id=View3D/>''. If necessary, enable the view of other editing scopes, in such case it is advisable to turn off the display of walls.<br/>[[File:Verify correctness.png|900 px|left|thumb|8. Verifying the correctness of the drainage installation structure using the <IS_TS id=View3D/>.]]<br clear="all"/>
* Verify provisionally the vertical routing of pipe-runs in the model (calculations may alter this).
* Specify, if necessary: the elevations of the ends of the pipe-runs (paying attention to constraints resulting from their connection to other components), the actual gradients of pipe-runs.
'''''ATTENTION! Following such changes, verification must be repeated.'''''<br clear="all"/>
<br/>
====Editing installation components data====
====Editing installation components data====
* Verify and adjust the drainage-specific data of the appliances (DU, outlet diameter),
* If necessary, verify and change pipe-run data to values other than default (pipe type, diameter, minimum and maximum gradient),
* (Optional) If needed, change the way of realizing chosen pipe-run's nodes to other than the default, set in general data. It is possible in the ''<IS_TS id=DataEditorTable/>'' window for the ''<IS_TS id=PiperunEndNode/>'' element,<br/>[[File:Node implementation.png |900 px|left|thumb|9. Change of pipe-run node realization.]]<br clear="all"/>
This article presents the basic path for quick and easy design of underfloor heating installations.
Projects, created in InstalSmart application, can be continued in InstalSystem application. In turn, opening of projects, created in InstalSystem application, is blocked, and the corresponding message is appeared.
Modules and program configuration
InstalSmart with the modules:
Base module
Radiant systems
Videos related to the article
The videos present the topics described in this article, but they aren’t a recording of this lesson.
Steps to perform
Preparing the working environment
Gaining access to the application
Download the program installation file from our website: Installation files.
Installation, activation, updating
Install the program via "Install" button.
1. InstalSmart5 Manager EN.
To activate the free neutral version of the program use the multi-activation license number SM-ISFEN-2432-001-YA.
2. Program activation.
Creating the project file
Create the project using the New project function.
3. New project creation.
Working with the project
Editing the general project data
Climatic data
Identify the location of the object to obtain the External temperature, design. 4.Climatic data.
Storeys management
Create the required number of storeys;
Specify Symbol and Description for each Storey;
Fill in the sections Position and Sizes. 5.Storeys management.
Room data
Choose the Method of calculating Φ - Calculated acc. to coefficient or User specified;
(optionally) Adjust the Heat loss index Φsurf,H. 6.Room data.
Thermal systems / Sources
Select the method of determining the supply temperature:
Optimized by the program in accordance with min. investment costs or heat output and press. drop;
Impose supply temperature manually. 7.Thermal systems / Sources.
Thermal systems / Radiant systems
Floor systems:
Specify Structural parameters;
Specify Operating parameters. 8.Thermal systems / Radiant systems / Floor systems.
Note:InstalSmart application does not offer the following options:
the option of generating loops, so there is no ability to set the Pipe laying pattern and to Generate loops drawings;
the option of inserting the Peripheral zone (PZ), so the adjustment of Available spacing in PZ is impossible;
the option to set the H/C Area spacing from wall;
the option pipe-feeds routing, so there is no possibility to specify the settings for the Pipe feeds arrangement;
the option of automatically indicating of the Default value θos,H (Temperature on the opposite side during heating period), so this value can be only User specified.
Manifolds, fittings and control:
Specify parameters for the Manifold;
Specify parameters for the Circuit control system. 9.Thermal systems / Radiant systems / Manifolds, fittings and control.
Editing the installation and its data
Verifying the correctness of the installation structure
Editing installation components data
Running the calculations
If no errors are found during verification, start the calculation of the Drainage systems by clicking in the Calculations section of the toolbar. The calculations finally determine the vertical routing of the pipe-runs.
After the calculations, it is possible to correct manually the vertical passage of pipe-runs in the following way:
imposing proper values in the Data table window for the Gravity sanitary drainage pipe-run element in the following fields: Real gradient, Elevation of first node, Elevation of second node,
dividing the chosen pipe-runs into parts and modifying their data. It is recommended to implement such changes gradually and to observe their influence upon the system, as the change in one node after calculations may have a significant impact on positioning of its greater part.
Note: Defining the vertical passage of pipe-runs, the program does not exceed the value imposed in the Maximum gradient field in the General data window in the Calculation standards and options tab. This value is also automatically propagated to data of all pipe-runs. In case a difference of ordinates between the end of the calculated pipe-run and another pipe-run or a sewage outlet occurs, an additional vertical pipe-run is generated. To avoid it, allow for a greater gradient, by augmenting individually for each pipe-run a new value in the Maximum gradient field of the Data table and then recalculating the project.
Verification of results
After calculations, the system layout should be verified visually by means of the 3D view.
If the calculations end with at least one error, the layout may be unreliable
The sized diameters of the pipe-runs and fittings can be verified directly in the drawings. 10. Visual verification in the 3D view window.
If a catalogue with visualisation of fittings (like tees, bends etc.) is used in the project, it can helpful in assessing the correctness of fittings selection and sizing for pipe-run nodes (junctions). To do so, node visualisation should be turned on in the General data window, on the Drawing options tab, or using the icon of the Installation elements' visibility directly in the 3D view. 11. Visualization of sewage fittings. Note: By default, only the nodes with correctly selected fittings, for which there are no warnings in the Diagnostics window, are visualised. Visualisation of the nodes having angle tolerance warnings may be enabled on request, and they will be drawn in a different colour. 12. Show in 3D view fittings for incorrectly sized nodes.
Other forms of presentation of calculation results are: component labels and tables of results For more information, see:Presentation of the calculations result 13. List of pipes, pipe fittings and couplings.
A Label with list of fittings may be added manually to each Junction.
15. Add the Label to each Junction manually.
Note: After obtaining the schematic view, fittings may be added on any pipe-run on the schematic view worksheet, that may be the best solution for vertical pipe-runs.
Preparing drawings for export/printing
To have the results for pipe-runs and installation nodes included in the printout of a drawing, appropriate labels must be inserted For more information, see:Preparation of drawings for export / printing
Specify the required settings and execute export of the installation using the IFC file export icon on the Main tools bar in the Printout and export section when the Printout editing scope is active.