Connecting storeys with the Riser (Stack) element: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
Line 17: Line 17:


==DESCRIPTION==
==DESCRIPTION==
<p>The ''<IS_TS id=iNamePion/>'' component enables connecting fragments of a system arranged on several plan sheets, each of which represents a separate storey. this allows making calculations of systems in multistorey buildings. The elevations of riser connections on the individual storeys are determined from the elevations of conduits. The effect of applying the riser and connection points can be checked using the 3D view.</p>
<p>The ''<IS_TS id=iNamePion/>'' component enables connecting fragments of a system arranged on several plan sheets, each of which represents a separate storey. This allows making calculations of systems in multistorey buildings. The elevations of riser connections on the individual storeys are determined from the elevations of conduits. The effect of applying the riser and connection points can be checked using the 3D view.</p>


==LOCATION IN THE PROGRAM==  
==LOCATION IN THE PROGRAM==  

Revision as of 22:46, 24 January 2016

Product InstalSystem 5
Type of article FUNCTIONALITY
Source for translation IS 5.0 Beta 24


DESCRIPTION

The Riser component enables connecting fragments of a system arranged on several plan sheets, each of which represents a separate storey. This allows making calculations of systems in multistorey buildings. The elevations of riser connections on the individual storeys are determined from the elevations of conduits. The effect of applying the riser and connection points can be checked using the 3D view.

LOCATION IN THE PROGRAM

Element Riser jest dostępny na pasku Main tools dla zakresów edycji: Rad.-floors,walls, Rad.-ceilings, Convectional.

1.Element pion


EXAMPLE OF USE

Wstawienie pionu przebiegającego przez kilka kondygnacji

  1. Wstawić Riser na jednym z rzutów.
  2. W elemencie Data table uzupełnić symbol oraz wybrać kondygnacje początkową i końcową.
  3. Podłączyć pion na wszystkich kondygnacjach do instalacji wykorzystując element Pipe-run.