Sewage installations - Bypass ventilation: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
No edit summary
No edit summary
Line 22: Line 22:
===Schema A===
===Schema A===
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features.<br/>[[File:Bypass ventilation schema A.png|900 px|left|thumb|2. Schema A.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_A.isproj Bypass ventilation Schema A, isproj]</br>
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features.<br/>[[File:Bypass ventilation schema A.png|900 px|left|thumb|1. Schema A.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_A.isproj Bypass ventilation Schema A, isproj]</br>
===Schema B===
===Schema B===
* Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
* Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used as an ''<IS_TS id=EndOfSewerageLine/>'' for both stacks (''<IS_TS id=strKanalizacjaSanitarna/>'' and ''<IS_TS id=strKanalizacjaWentylacja/>'').<br/>[[File:Bypass ventilation schema B.png|900 px|left|thumb|3. Schema B.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_B.isproj Bypass ventilation Schema B, isproj]</br>
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used as an ''<IS_TS id=EndOfSewerageLine/>'' for both stacks (''<IS_TS id=strKanalizacjaSanitarna/>'' and ''<IS_TS id=strKanalizacjaWentylacja/>'').<br/>[[File:Bypass ventilation schema B.png|900 px|left|thumb|2. Schema B.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_B.isproj Bypass ventilation Schema B, isproj]</br>
===Schema С===
===Schema С===
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' are made;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' are made;
* Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.<br/>[[File:Bypass ventilation schema С.png|900 px|left|thumb|4. Schema C.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_C.isproj Bypass ventilation Schema C, isproj]</br>
* Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.<br/>[[File:Bypass ventilation schema С.png|900 px|left|thumb|3. Schema C.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_C.isproj Bypass ventilation Schema C, isproj]</br>
===Schema D===
===Schema D===
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture;
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture;
* ''<IS_TS id=iNameSanWentylacjaKanalizacji/>'' are connected to the sewage stack on the floors above.<br/>[[File:Bypass ventilation schema D.png |900 px|left|thumb|5. Schema D.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_D.isproj Bypass ventilation Schema D, isproj]</br>
* ''<IS_TS id=iNameSanWentylacjaKanalizacji/>'' are connected to the sewage stack on the floors above.<br/>[[File:Bypass ventilation schema D.png |900 px|left|thumb|4. Schema D.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_D.isproj Bypass ventilation Schema D, isproj]</br>
===Schema E===
===Schema E===
* In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
* In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
* The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
* The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well;
* The connection of the additional stack to the main stack is made by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|6. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj]
* The connection of the additional stack to the main stack is made by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|5. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj]
<!-- Do not write text below this tag -->
<!-- Do not write text below this tag -->



Revision as of 11:24, 30 August 2023

Product InstalSystem 5
Type of article SAMPLE PROJECT
Source for translation 2023-08-21


Project description

The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height). Schema E - for the buildings with more than 5 floors (more than 12m in height).

Files to download and project information

Schema A

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
  • Generate intermediate ventilation connections can be made or not depending on the project features.
    1. Schema A.

    Bypass ventilation Schema A, isproj

Schema B

  • Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
  • Air admittance valve is used as an Element on top of stack for both stacks (Sanitary drainage and Ventilation conduit).
    2. Schema B.

    Bypass ventilation Schema B, isproj

Schema С

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
  • Generate intermediate ventilation connections are made;
  • Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.
    3. Schema C.

    Bypass ventilation Schema C, isproj

Schema D

  • Air admittance valve is used on the first floor for the most distant fixture;
  • Drainage ventilating pipe-run are connected to the sewage stack on the floors above.
    4. Schema D.

    Bypass ventilation Schema D, isproj

Schema E

  • In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
  • The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
  • Generate intermediate ventilation connections is declared as well;
  • The connection of the additional stack to the main stack is made by the means of a "vent loop".
    5. Schema E.

    Bypass ventilation Schema E, isproj