The attached projects present an exemplary solutions for a sewage installation with bypass ventilation. Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height). Schema E - for the buildings with more than 5 floors (more than 12m in height).
Files to download and project information
Schema A
Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
Air admittance valve is used as an Element on top of stack for both stacks (Sanitary drainage and Ventilation conduit). 2. Schema B. Bypass ventilation Schema B, isproj
Schema С
Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
Generate intermediate ventilation connections are made automatically;
Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above. 3. Schema C. Bypass ventilation Schema C, isproj
Schema D
Air admittance valve is used on the first floor for the most distant fixture;