Sewage installations - Bypass ventilation: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
Line 33: Line 33:
* Schema A:
* Schema A:
** Parallel ventilation stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent cowl;
** Parallel ventilation stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent cowl;
** ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features. In the presented example, this type of connection is made.
** ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features.


==Additional informations==  
==Additional informations==  

Revision as of 16:20, 21 June 2023

Product InstalSystem 5
Type of article FUNCTION AND TOOL
Source for translation 2023-06-21


Description

The article describes methods of implementation of double stacks, which are a combination of sewage and ventilation bypass stacks.

Videos related to the article



Location in the program

The type of the stack is indicated in the Data table.

1. Pipe-run types.


All necessary points should be specified.

Example of use

The program provides several ways to perform such types of stacks.

  • Schema A:
    • Parallel ventilation stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent cowl;
    • Generate intermediate ventilation connections can be made or not depending on the project features.

Additional informations

Optional section that contains additional information describing the function/element of the program..