Sewage installations - Bypass ventilation: Difference between revisions
Jump to navigation
Jump to search
Klintsevicho (talk | contribs) No edit summary |
Klintsevicho (talk | contribs) |
||
| Line 26: | Line 26: | ||
==Location in the program== | ==Location in the program== | ||
The type of the stack should be indicated in the ''<IS_TS id=DataEditorTable/>''.<br/>[[File:Bypass ventilation location.png|900 px|left|thumb|1. <IS_TS id=typyWlaczenWPionie/>.]]<br clear="all"/> | |||
==Example of use== | ==Example of use== | ||
Revision as of 15:14, 21 June 2023
| Product | InstalSystem 5 |
| Type of article | FUNCTION AND TOOL |
| Source for translation | 2023-06-21 |
Description
The article describes methods of implementation of double stacks, which are a combination of sewage and ventilation bypass stacks.
Location in the program
The type of the stack should be indicated in the Data table.

Example of use
Section containing the description of using the function - next steps.
In this section you may fing a multiple examples of use, each of these examples is a separate point of this section.
They can be found in it such elements as:
- screenshots (clearly indicating element, eg. by selecting the ellipse). Screenshots should be align to the left side, in order to keep the appropriate indentation before inserting a screenshot is needed to put the mark ":".
- A film or a reference to the film imaging use of the functions.
Warning! Acceptable is to give a few examples. Then each example is a separate section or point in the article).
Additional informations
Optional section that contains additional information describing the function/element of the program..