Automatically connect terminal units: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
Line 17: Line 17:
   
   
==Description==
==Description==
''<IS_TS id=btPodlaczGrzejnikiDoLinii/>'' is an operation that enables automatic connecting of terminal units with specified connection points to ''<IS_TS id=iNameDzialka/>''/''<IS_TS id=iNameOPDzialka/>''. After selecting all components to be connected and after performing the operation, additional fragments of the system are created (''<IS_TS id=iNameDzialkaPlural/>''). Components handled by the operation:
''<IS_TS id=btPodlaczGrzejnikiDoLinii/>'' is an operation that enables automatic connecting of terminal units with specified connection points to ''<IS_TS id=iNameDzialka/>''/''<IS_TS id=iNameOPDzialka/>'' components. After selecting all components to be connected and after performing the operation, additional fragments of the system are created (''<IS_TS id=iNameDzialkaPlural/>''). Components handled by the operation:
*''<IS_TS id=iNameDzialka/>''/''<IS_TS id=iNameOPDzialka/>''
*''<IS_TS id=iNameDzialka/>''/''<IS_TS id=iNameOPDzialka/>''
*Terminal units
*Terminal units

Revision as of 11:59, 7 October 2017

Product InstalSystem 5
Type of article FUNCTIONALITY
Source for translation BETA REV. 2.0.B6


Description

Automatically connect terminal units is an operation that enables automatic connecting of terminal units with specified connection points to Pipe-run/Pipe feed components. After selecting all components to be connected and after performing the operation, additional fragments of the system are created (Pipe-runs). Components handled by the operation:

  • Pipe-run/Pipe feed
  • Terminal units
    -Heating/Cooling area
    -Ceiling panel/Wall panel
    -Radiator
    -Terminal unit
    -Source
    -Manifold
    -Remote connection

Location in the program

Operacja Automatically connect terminal units dostępna jest w programie w oknie 2D editor na pasku Main tools w sekcji Edit, dla aktywnych zakresów edycji Rad.-floors,walls, Rad.-ceilings lub Convectional

1. Automatically connect terminal units


Example of use

Użycie na przykładzie łączenia elementów Radiator z instalacją

Użycie na przykładzie łączenia elementów Heating/Cooling area w układzie Tichelmanna

Additional informations

  • Po zakończeniu operacji tworzenia dodatkowych działek i podłączania odbiorników, zaznaczeniu ulegają wszystkie "ślepe" odcinki należące do fragmentu instalacji biorącej udział w operacji. "Ślepe" odcinki to te które są jednostronnie niepodłączone do innego odcinka lub odbiornika. Umożliwia to łatwe usunięcie zbędnych elementów instalacji.
    2. Zaznaczone odcinki po wykonaniu operacji

  • W trakcie podłączania elementu Heating/Cooling area konieczne jest, aby Pipe-run/Pipe feed połączone były z elementem Source lub Riser.