The attached projects present an exemplary solutions for a sewage installation with bypass ventilation. Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height). Schema E - for the buildings with more than 5 floors (more than 12m in height).
Files to download and project information
Schema A
Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
Generate intermediate ventilation connections can be made or not depending on the project features. 1. Schema A. Bypass ventilation Schema A, isproj
Schema B
Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;