How to modify an automatically generated schematic view: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
No edit summary
Tag: Reverted
No edit summary
Tag: Manual revert
 
Line 38: Line 38:


<!-- Do not write text below this tag -->
<!-- Do not write text below this tag -->
<br class="iwlinks"/>[[zh-cn:如何修改自动创建的示意图|如何修改自动创建的示意图]]
<br class="iwlinks"/>[[pl:Jak zmodyfikować automatyczne rozwinięcie instalacji|Jak zmodyfikować automatyczne rozwinięcie instalacji]][[zh-cn:如何修改自动创建的示意图|如何修改自动创建的示意图]]

Latest revision as of 23:05, 12 June 2026

Product InstalSystem 5
Type of article TIP&TRICK
Source for translation 2023-10-24


Problem description

After the automatic generating of a schematic view of the installation in some cases its modification is required. This article describes how to modify the Order of installation fragments and how to reduce gaps in the pipeline sections with the use of Control point.

Solution

Use Control point to:

  • Modify the Order of installation fragments:
    • the order of arrangement of risers connected to the manifold;

    • the connection order for all kinds of manifolds, except those supplying radiant systems, which cannot be treated that way.
      Note: to specify the fragment of the installation to be generated use the Starting point and the Endpoint.
  • Reduce gaps in the pipeline sections.


If you have any comments on this article, please send us a short message at info@instalsoft.com