How to modify an automatically generated schematic view
Jump to navigation
Jump to search
Product | InstalSystem 5 |
Type of article | TIP&TRICK |
Source for translation | 2023-10-24 |
Problem description
After the automatic generating of a schematic view of the installation in some cases its modification is required. This article describes how to modify the Order of installation fragments and how to reduce gaps in the pipeline sections with the use of Control point.
Solution
Use Control point to:
- Modify the Order of installation fragments:
- the order of arrangement of risers connected to the manifold;
- the connection order for all kinds of manifolds, except those supplying radiant systems, which cannot be treated that way.
Note: to specify the fragment of the installation to be generated use the Starting point and the Endpoint.
- the order of arrangement of risers connected to the manifold;
- Reduce gaps in the pipeline sections.