Hydraulic control loop: Difference between revisions
Klintsevicho (talk | contribs) |
Klintsevicho (talk | contribs) |
||
| Line 24: | Line 24: | ||
To use the ''<IS_TS id=iNameCOWezelRegulacyjny/>'' element, the corresponding catalogues should be selected and added to the project in the ''<IS_TS id=rsDanogi/>'' window / ''<IS_TS id=strDlgKatalogiObslugaKatalogowHint/>'' tab. {{Info}} [[Using_catalogues_and_catalogues_data_in_the_project#Selecting_catalogues_for_the_project | Selecting catalogues for the project]]. | To use the ''<IS_TS id=iNameCOWezelRegulacyjny/>'' element, the corresponding catalogues should be selected and added to the project in the ''<IS_TS id=rsDanogi/>'' window / ''<IS_TS id=strDlgKatalogiObslugaKatalogowHint/>'' tab. {{Info}} [[Using_catalogues_and_catalogues_data_in_the_project#Selecting_catalogues_for_the_project | Selecting catalogues for the project]]. | ||
[[File:HCL add catalogues.png |900 px|left|thumb|2. <IS_TS id=iNameCOWezelRegulacyjny/> <IS_TS id=strDlgKatalogiObslugaKatalogowHint/>.]]<br clear="all"/> | [[File:HCL add catalogues.png |900 px|left|thumb|2. <IS_TS id=iNameCOWezelRegulacyjny/> <IS_TS id=strDlgKatalogiObslugaKatalogowHint/>.]]<br clear="all"/> | ||
The ''<IS_TS id= | The element can be placed on the drawing when ''<IS_TS id=ScopeInstalacjeKonwekcyjneShort/>'', ''<IS_TS id=ScopeInstalacjePodlogoweIScienneShort/>'' or ''<IS_TS id=ScopeInstalacjeSufitoweShort />'' editing scope is active: | ||
* clicking the icon ''<IS_TS id=iNameCOWezelRegulacyjny/>'' in the ''<IS_TS id=Rozprowadzenie/>'' - ''<IS_TS id=Cieplne/>'' tab in the ''<IS_TS id=NarzedziaGlowne/>'' menu: <br/>[[File:HCL icon location.png |900 px|left|thumb|3. <IS_TS id=iNameCOWezelRegulacyjny/> icon.]]<br clear="all"/> | |||
* clicking the icon with schemes presented by the particular producers: <br/>[[File:HCL prod location.png |900 px|left|thumb|4. <IS_TS id=iNameCOWezelRegulacyjny/> schemes.]]<br clear="all"/> | |||
==Examples of use== | ==Examples of use== | ||
Revision as of 11:47, 30 January 2026
| Product | InstalSystem 5 |
| Type of article | FUNCTION AND TOOL |
| Source for translation | 2026-01-27 |
Description
Hydraulic control loop is the element used to hydraulically balance and regulate (qualitatively or quantitatively) the thermal efficiency of the end receiver (e.g., fan-coil or cooling beam). The article describes the ways of applying the element in the program.
Location in program
Hydraulic control loop is presented in the program as a separate module, the availability of which is visible in the InstalSystem 5.5 Manager / Help tab / list of Modules available in current licence configuration:

To use the Hydraulic control loop element, the corresponding catalogues should be selected and added to the project in the General data window / Catalogues tab. For more information, see: Selecting catalogues for the project.

The element can be placed on the drawing when Convectional, Rad.-floors,walls or Rad.-ceilings editing scope is active:
- clicking the icon Hydraulic control loop in the Distribution - thermal installations tab in the Main tools menu:

3. Hydraulic control loop icon. - clicking the icon with schemes presented by the particular producers:

4. Hydraulic control loop schemes.
Examples of use
Hydraulic control loop is a prefabricated block of grouped elements and is not graphically editable. May include a pump, balancing valves, control valves and overflow-relief valve. Allows the use of valves and fittings only from a list of items, suitable for use in a given location, in a configuration precisely defined by producers.