How to modify an automatically generated schematic view: Difference between revisions
Jump to navigation
Jump to search
Klintsevicho (talk | contribs) |
Klintsevicho (talk | contribs) |
||
| Line 22: | Line 22: | ||
Use ''<IS_TS id=rpCreateSchematicGuide/>'' to: | Use ''<IS_TS id=rpCreateSchematicGuide/>'' to: | ||
* Modify the ''<IS_TS id=strKolejnoscRozwijaniaCaption/>'': | * Modify the ''<IS_TS id=strKolejnoscRozwijaniaCaption/>'': | ||
** the order of arrangement of risers connected to the manifold;<br> {{#ev:youtube| | ** the order of arrangement of risers connected to the manifold;<br> {{#ev:youtube|s8L6BYiJLss|900||||rel=0}}<br> | ||
** the connection order for all kinds of manifolds, except those supplying radiant systems, which cannot be treated that way.<br>'''Note:''' to specify the fragment of the installation to be generated use the ''<IS_TS id=SchematicStartPointNameSingle/>'' and the ''<IS_TS id=SchematicEndPointNameSingle/>''. <br>{{#ev:youtube|WiR1-Kka5ds|900||||rel=0}} | ** the connection order for all kinds of manifolds, except those supplying radiant systems, which cannot be treated that way.<br>'''Note:''' to specify the fragment of the installation to be generated use the ''<IS_TS id=SchematicStartPointNameSingle/>'' and the ''<IS_TS id=SchematicEndPointNameSingle/>''. <br>{{#ev:youtube|WiR1-Kka5ds|900||||rel=0}} | ||
* Reduce gaps in the pipeline sections.<br> {{#ev:youtube|pM4EaY3frlg|900||||rel=0}} | * Reduce gaps in the pipeline sections.<br> {{#ev:youtube|pM4EaY3frlg|900||||rel=0}} | ||
Revision as of 10:18, 3 November 2023
| Product | InstalSystem 5 |
| Type of article | TIP&TRICK |
| Source for translation | 2023-10-24 |
Problem description
After the automatic generating of a schematic view of the installation in some cases its modification is required. This article describes how to modify the Order of installation fragments and how to reduce gaps in the pipeline sections with the use of Control point.
Solution
Use Control point to:
- Modify the Order of installation fragments:
- the order of arrangement of risers connected to the manifold;
- the connection order for all kinds of manifolds, except those supplying radiant systems, which cannot be treated that way.
Note: to specify the fragment of the installation to be generated use the Starting point and the Endpoint.
- the order of arrangement of risers connected to the manifold;
- Reduce gaps in the pipeline sections.