Sewage installations - Bypass ventilation: Difference between revisions
Jump to navigation
Jump to search
Klintsevicho (talk | contribs) |
Klintsevicho (talk | contribs) |
||
| Line 21: | Line 21: | ||
==Description== | ==Description== | ||
The article describes methods of implementation of double stacks, which are a combination of sewage and ventilation bypass stacks. | The article describes methods of implementation of double stacks, which are a combination of sewage and ventilation bypass stacks. | ||
==Location in the program== | ==Location in the program== | ||
Revision as of 07:39, 22 June 2023
| Product | InstalSystem 5 |
| Type of article | FUNCTION AND TOOL |
| Source for translation | 2023-06-21 |
Description
The article describes methods of implementation of double stacks, which are a combination of sewage and ventilation bypass stacks.
Location in the program
The type of the stack is indicated in the Data table.

All necessary points should be specified.
Example of use
The program provides several ways to perform such types of stacks. Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height). Schema E - for the buildings with more than 5 floors (more than 12m in height)
- Schema A:
Additional informations
Optional section that contains additional information describing the function/element of the program..
