Sewage installations - Bypass ventilation: Difference between revisions
Jump to navigation
Jump to search
Klintsevicho (talk | contribs) |
Klintsevicho (talk | contribs) |
||
| Line 33: | Line 33: | ||
* Schema A: | * Schema A: | ||
** Parallel ventilation stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent cowl; | ** Parallel ventilation stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent cowl; | ||
** ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features | ** ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features. | ||
==Additional informations== | ==Additional informations== | ||
Revision as of 16:20, 21 June 2023
| Product | InstalSystem 5 |
| Type of article | FUNCTION AND TOOL |
| Source for translation | 2023-06-21 |
Description
The article describes methods of implementation of double stacks, which are a combination of sewage and ventilation bypass stacks.
Location in the program
The type of the stack is indicated in the Data table.

All necessary points should be specified.
Example of use
The program provides several ways to perform such types of stacks.
- Schema A:
- Parallel ventilation stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent cowl;
- Generate intermediate ventilation connections can be made or not depending on the project features.
Additional informations
Optional section that contains additional information describing the function/element of the program..