Sewage installations - Bypass ventilation: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
<IS_HELP id="HS167"/>
<IS_HELP id="HS167"/>
<!--Case 337610-->
{{Article table
{{Article table
|commercial_product1=InstalSystem 5
|commercial_product1=InstalSystem 5
Line 35: Line 36:
===Schema D===
===Schema D===
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture;
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture;
* ''<IS_TS id=iNameSanWentylacjaKanalizacji/>'' are connected to the sewage stack on the floors above.<br/>[[File:Sewage installations Bypass ventilation Schema D.png|900 px|left|thumb|4. Schema D.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_D.isproj Bypass ventilation Schema D, isproj]</br>
* ''<IS_TS id=iNameSanWentylacjaKanalizacji/>'' are connected to the sewage stack.<br/>[[File:Sewage installations Bypass ventilation Schema D.png|900 px|left|thumb|4. Schema D.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_D.isproj Bypass ventilation Schema D, isproj]</br>
===Schema E===
===Schema E===
* In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
* In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
Line 55: Line 56:


<!-- Do not write text below this tag -->
<!-- Do not write text below this tag -->
<br class="iwlinks"/>[[zh-cn:排水 - 通气管|排水 - 通气管]]
<br class="iwlinks"/>[[pl:Kanalizacja grawitacyjna - wentylacja obejściowa|Kanalizacja grawitacyjna - wentylacja obejściowa]][[zh-cn:排水 - 通气管|排水 - 通气管]]

Latest revision as of 23:01, 7 July 2026

Product InstalSystem 5
Type of article SAMPLE PROJECT
Source for translation 2026-06-23


Project description

The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).
Schema E - for the buildings with more than 5 floors (more than 12m in height).

Files to download and project information

Schema A

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
  • Generate intermediate ventilation connections can be made or not depending on the project features.
    1. Schema A.

    Bypass ventilation Schema A, isproj

Schema B

  • Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
  • Air admittance valve is used as an Element on top of stack for both stacks (Sanitary drainage and Ventilation conduit).
    2. Schema B.

    Bypass ventilation Schema B, isproj

Schema С

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
  • Generate intermediate ventilation connections are made automatically;
  • Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.
    3. Schema C.

    Bypass ventilation Schema C, isproj

Schema D

  • Air admittance valve is used on the first floor for the most distant fixture;
  • Drainage ventilating pipe-run are connected to the sewage stack.
    4. Schema D.

    Bypass ventilation Schema D, isproj

Schema E


If you have any comments on this article, please send us a short message at info@instalsoft.com.