Sewage installations - Bypass ventilation: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
No edit summary
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<IS_HELP id="HSxx"/>
<IS_HELP id="HS167"/>
{{Article table
{{Article table
|commercial_product1=InstalSystem 5
|commercial_product1=InstalSystem 5
Line 11: Line 11:
|c3                =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|c3                =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|category_name3    =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...-->
|category_name3    =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...-->
|version1          =2023-08-21
|version1          =2024-06-10
|v2                =
|v2                =
|v3                =
|v3                =
Line 39: Line 39:
* The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
* The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well;
* The connection of the additional stack to the main stack is made by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|5. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj]
* The connection of the additional stack to the main stack is made automatically by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|5. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj]
<!-- Do not write text below this tag -->
<!-- Do not write text below this tag -->


<!--Specify the list of categories of commercial products, which the article concerns-->
<!--Specify the list of categories of commercial products, which the article concerns-->
{|class="wikitable" style="width: 800px; margin: 0 auto;"
!If you have any comments on this article, please send us a short message at ''info@instalsoft.com''.
                 
|}


[[Category:InstalSystem 5]]
[[Category:InstalSystem 5]]
[[Category:SAMPLE PROJECT]]
[[Category:SAMPLE PROJECT]]
<!-- Do not write text below this tag -->
<br class="iwlinks"/>[[pl:Kanalizacja grawitacyjna - wentylacja obejściowa|Kanalizacja grawitacyjna - wentylacja obejściowa]][[zh-cn:排水 - 通气管|排水 - 通气管]]

Latest revision as of 14:28, 11 July 2025

Product InstalSystem 5
Type of article SAMPLE PROJECT
Source for translation 2024-06-10


Project description

The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).
Schema E - for the buildings with more than 5 floors (more than 12m in height).

Files to download and project information

Schema A

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
  • Generate intermediate ventilation connections can be made or not depending on the project features.
    1. Schema A.

    Bypass ventilation Schema A, isproj

Schema B

  • Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
  • Air admittance valve is used as an Element on top of stack for both stacks (Sanitary drainage and Ventilation conduit).
    2. Schema B.

    Bypass ventilation Schema B, isproj

Schema С

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
  • Generate intermediate ventilation connections are made automatically;
  • Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.
    3. Schema C.

    Bypass ventilation Schema C, isproj

Schema D

  • Air admittance valve is used on the first floor for the most distant fixture;
  • Drainage ventilating pipe-run are connected to the sewage stack on the floors above.
    4. Schema D.

    Bypass ventilation Schema D, isproj

Schema E

  • In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
  • The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
  • Generate intermediate ventilation connections is declared as well;
  • The connection of the additional stack to the main stack is made automatically by the means of a "vent loop".
    5. Schema E.

    Bypass ventilation Schema E, isproj