Sewage installations - Bypass ventilation: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (6 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
<IS_HELP id=" | <IS_HELP id="HS167"/> | ||
{{Article table | {{Article table | ||
|commercial_product1=InstalSystem 5 | |commercial_product1=InstalSystem 5 | ||
| Line 11: | Line 11: | ||
|c3 =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu--> | |c3 =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu--> | ||
|category_name3 =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...--> | |category_name3 =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...--> | ||
|version1 = | |version1 =2024-06-10 | ||
|v2 = | |v2 = | ||
|v3 = | |v3 = | ||
| Line 18: | Line 18: | ||
==Project description== | ==Project description== | ||
The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.<br/>Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height). Schema E - for the buildings with more than 5 floors (more than 12m in height). | The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.<br/>Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).<br/>Schema E - for the buildings with more than 5 floors (more than 12m in height). | ||
==Files to download and project information== | ==Files to download and project information== | ||
===Schema A=== | ===Schema A=== | ||
| Line 28: | Line 29: | ||
===Schema С=== | ===Schema С=== | ||
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe; | * Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe; | ||
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' are made; | * ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' are made automatically; | ||
* Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.<br/>[[File:Bypass ventilation schema С.png|900 px|left|thumb|3. Schema C.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_C.isproj Bypass ventilation Schema C, isproj]</br> | * Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.<br/>[[File:Bypass ventilation schema С.png|900 px|left|thumb|3. Schema C.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_C.isproj Bypass ventilation Schema C, isproj]</br> | ||
===Schema D=== | ===Schema D=== | ||
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture; | * ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture; | ||
| Line 37: | Line 39: | ||
* The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack; | * The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack; | ||
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well; | * ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well; | ||
* The connection of the additional stack to the main stack is made by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|5. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj] | * The connection of the additional stack to the main stack is made automatically by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|5. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj] | ||
<!-- Do not write text below this tag --> | <!-- Do not write text below this tag --> | ||
<!--Specify the list of categories of commercial products, which the article concerns--> | <!--Specify the list of categories of commercial products, which the article concerns--> | ||
{|class="wikitable" style="width: 800px; margin: 0 auto;" | |||
!If you have any comments on this article, please send us a short message at ''info@instalsoft.com''. | |||
|} | |||
[[Category:InstalSystem 5]] | [[Category:InstalSystem 5]] | ||
[[Category:SAMPLE PROJECT]] | [[Category:SAMPLE PROJECT]] | ||
<!-- Do not write text below this tag --> | |||
<br class="iwlinks"/>[[pl:Kanalizacja grawitacyjna - wentylacja obejściowa|Kanalizacja grawitacyjna - wentylacja obejściowa]][[zh-cn:排水 - 通气管|排水 - 通气管]] | |||
Latest revision as of 14:28, 11 July 2025
| Product | InstalSystem 5 |
| Type of article | SAMPLE PROJECT |
| Source for translation | 2024-06-10 |
Project description
The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).
Schema E - for the buildings with more than 5 floors (more than 12m in height).
Files to download and project information
Schema A
- Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
- Generate intermediate ventilation connections can be made or not depending on the project features.

1. Schema A.
Bypass ventilation Schema A, isproj
Schema B
- Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
- Air admittance valve is used as an Element on top of stack for both stacks (Sanitary drainage and Ventilation conduit).

2. Schema B.
Bypass ventilation Schema B, isproj
Schema С
- Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
- Generate intermediate ventilation connections are made automatically;
- Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.

3. Schema C.
Bypass ventilation Schema C, isproj
Schema D
- Air admittance valve is used on the first floor for the most distant fixture;
- Drainage ventilating pipe-run are connected to the sewage stack on the floors above.

4. Schema D.
Bypass ventilation Schema D, isproj
Schema E
- In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
- The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
- Generate intermediate ventilation connections is declared as well;
- The connection of the additional stack to the main stack is made automatically by the means of a "vent loop".

5. Schema E.
Bypass ventilation Schema E, isproj
| If you have any comments on this article, please send us a short message at info@instalsoft.com. |
|---|