Sewage installations - Bypass ventilation: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
No edit summary
No edit summary
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<IS_HELP id="HS167"/>
{{Article table
{{Article table
|commercial_product1=InstalSystem 5
|commercial_product1=InstalSystem 5
Line 4: Line 5:
|p3                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|p3                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|p4                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|p4                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|category1          =InstalSystem 5#Functionalities
|category1          =InstalSystem 5#Sample project
|category_name1    =FUNCTION AND TOOL
|category_name1    =SAMPLE PROJECT
|c2                =<!--Jest kategoria -> zamienić na: "category2=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|c2                =<!--Jest kategoria -> zamienić na: "category2=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|category_name2    =<!--podać nazwę kategorii "ZASTOSOWANIE"/"FUNKCJONALNOŚĆ"/...-->
|category_name2    =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...-->
|c3                =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|c3                =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|category_name3    =<!--podać nazwę kategorii "ZASTOSOWANIE"/"FUNKCJONALNOŚĆ"/...-->
|category_name3    =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...-->
|version1          =2023-06-21
|version1          =2024-06-10
|v2                =<!--Jest wersja -> zamienić na: "version2=" i uzupełnić link:
|v2                =
                        IS4 -> "[https://instalsoft.com/pl/produkty/informacje-o-zmianach-w-instalsystem.html <numer wersji>]" /
|v3                 =
                        NS4 -> "[https://instalsoft.com/pl/produkty/informacje-o-zmianach-w-netsystem.html <numer wersji>]" /
|v4                 =
                        IS5 -> "[[<link do sekcji RN danego produktu>|<numer wersji>]]"-->
|v3=
|v4=
}}
}}


==Description==
==Project description==
The article describes methods of implementation of various cases of bypass ventilation in sewage installations.
The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.<br/>Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).<br/>Schema E - for the buildings with more than 5 floors (more than 12m in height).


==Location in the program==  
==Files to download and project information==
In many cases of bypass ventilation the internal structure of stacks should be changed. This is achieved by modifying stack data: types of pipes inside, declaration of elements on the top, declaration of internal connections, etc.
===Schema A===
The type of the stack is indicated in the ''<IS_TS id=DataEditorTable/>''.<br/>[[File:Bypass ventilation location.png|900 px|left|thumb|1. <IS_TS id=typyWlaczenWPionie/>.]]<br clear="all"/>
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
All necessary points should be specified. Some geometrical data (distances between internal connections) have default values, but these may not fit all cases and often require manual correction after observing the 3D model.
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features.<br/>[[File:Bypass ventilation schema A.png|900 px|left|thumb|1. Schema A.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_A.isproj Bypass ventilation Schema A, isproj]</br>
===Schema B===
* Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used as an ''<IS_TS id=EndOfSewerageLine/>'' for both stacks (''<IS_TS id=strKanalizacjaSanitarna/>'' and ''<IS_TS id=strKanalizacjaWentylacja/>'').<br/>[[File:Bypass ventilation schema B.png|900 px|left|thumb|2. Schema B.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_B.isproj Bypass ventilation Schema B, isproj]</br>
===Schema С===
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' are made automatically;
* Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.<br/>[[File:Bypass ventilation schema С.png|900 px|left|thumb|3. Schema C.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_C.isproj Bypass ventilation Schema C, isproj]</br>


==Example of use==
===Schema D===
The program provides several schemes of bypass ventilation. Please note, that all changes inside the stack can be achieved only by changing stack data (no graphical edition possible). After drawing and connecting a ventilation pipe-run to a sewage pipe-run, manual correction of the elevations may be necessary. 
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture;
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height). Schema E - for the buildings with more than 5 floors (more than 12m in height).
* ''<IS_TS id=iNameSanWentylacjaKanalizacji/>'' are connected to the sewage stack on the floors above.<br/>[[File:Bypass ventilation schema D.png |900 px|left|thumb|4. Schema D.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_D.isproj Bypass ventilation Schema D, isproj]</br>
* Schema A:
===Schema E===
** Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
* In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
** ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features.<br/>[[File:Bypass ventilation schema A.png|900 px|left|thumb|2. Schema A.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_A.isproj Bypass ventilation Schema A, isproj]</br>
* The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
* Schema B:
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well;
** Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
* The connection of the additional stack to the main stack is made automatically by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|5. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj]
** ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used as an ''<IS_TS id=EndOfSewerageLine/>'' for both stacks (''<IS_TS id=strKanalizacjaSanitarna/>'' and ''<IS_TS id=strKanalizacjaWentylacja/>'').<br/>[[File:Bypass ventilation schema B.png|900 px|left|thumb|3. Schema B.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_B.isproj Bypass ventilation Schema B, isproj]</br>
<!-- Do not write text below this tag -->
* Schema С:
** Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
** ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' are made;
** Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.<br/>[[File:Bypass ventilation schema С.png|900 px|left|thumb|4. Schema C.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_C.isproj Bypass ventilation Schema C, isproj]</br>
* Schema D:
** ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture;
** ''<IS_TS id=iNameSanWentylacjaKanalizacji/>'' are connected to the sewage stack on the floors above.<br/>[[File:Bypass ventilation schema D.png |900 px|left|thumb|5. Schema D.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_D.isproj Bypass ventilation Schema D, isproj]</br>
* Schema E:
** In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
** The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
** ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well;
** The connection of the additional stack to the main stack is made by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|6. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj]


<!--Specify the list of categories of commercial products, which the article concerns-->
<!--Specify the list of categories of commercial products, which the article concerns-->
{|class="wikitable" style="width: 800px; margin: 0 auto;"
!If you have any comments on this article, please send us a short message at ''info@instalsoft.com''.
                 
|}


[[Category:InstalSystem 5]]
[[Category:InstalSystem 5]]
[[Category:FUNCTION AND TOOL]]
[[Category:SAMPLE PROJECT]]
 
<!-- Do not write text below this tag -->
<br class="iwlinks"/>[[pl:Kanalizacja grawitacyjna - wentylacja obejściowa|Kanalizacja grawitacyjna - wentylacja obejściowa]][[zh-cn:排水 - 通气管|排水 - 通气管]]

Latest revision as of 14:28, 11 July 2025

Product InstalSystem 5
Type of article SAMPLE PROJECT
Source for translation 2024-06-10


Project description

The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).
Schema E - for the buildings with more than 5 floors (more than 12m in height).

Files to download and project information

Schema A

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
  • Generate intermediate ventilation connections can be made or not depending on the project features.
    1. Schema A.

    Bypass ventilation Schema A, isproj

Schema B

  • Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
  • Air admittance valve is used as an Element on top of stack for both stacks (Sanitary drainage and Ventilation conduit).
    2. Schema B.

    Bypass ventilation Schema B, isproj

Schema С

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
  • Generate intermediate ventilation connections are made automatically;
  • Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.
    3. Schema C.

    Bypass ventilation Schema C, isproj

Schema D

  • Air admittance valve is used on the first floor for the most distant fixture;
  • Drainage ventilating pipe-run are connected to the sewage stack on the floors above.
    4. Schema D.

    Bypass ventilation Schema D, isproj

Schema E

  • In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
  • The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
  • Generate intermediate ventilation connections is declared as well;
  • The connection of the additional stack to the main stack is made automatically by the means of a "vent loop".
    5. Schema E.

    Bypass ventilation Schema E, isproj


If you have any comments on this article, please send us a short message at info@instalsoft.com.