Sewage installations - Bypass ventilation: Difference between revisions

From HelpSystem
Jump to navigation Jump to search
(Created page with "{{Article table |commercial_product1=InstalSystem 5 |p2 =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy2="--> |p3 =<!--...")
 
No edit summary
 
(45 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<IS_HELP id="HS167"/>
{{Article table
{{Article table
|commercial_product1=InstalSystem 5
|commercial_product1=InstalSystem 5
Line 4: Line 5:
|p3                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|p3                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|p4                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|p4                =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handlowy3="-->
|category1          =InstalSystem 5#Designing lessons
|category1          =InstalSystem 5#Sample project
|category_name1    =DESIGNING LESSON
|category_name1    =SAMPLE PROJECT
|c2                =<!--Jest kategoria -> zamienić na: "category2=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|c2                =<!--Jest kategoria -> zamienić na: "category2=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|category_name2    =<!--podać nazwę kategorii "ZASTOSOWANIE"/"FUNKCJONALNOŚĆ"/...-->
|category_name2    =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...-->
|c3                =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|c3                =<!--Jest kategoria -> zamienić na: "category3=" i uzupełnić link do sekcji kategorii na stronie głównej produktu-->
|category_name3    =<!--podać nazwę kategorii "ZASTOSOWANIE"/"FUNKCJONALNOŚĆ"/...-->
|category_name3    =<!--podać nazwę kategorii, np.: ZASTOSOWANIE/FUNKCJONALNOŚĆ/...-->
|version1          =2023-21-06
|version1          =2024-06-10
|v2                =<!--Jest wersja -> zamienić na: "version2=" i uzupełnić link do sekcji RN danego produktu-->
|v2                =
|v3                =<!--Jest wersja -> zamienić na: "version2=" i uzupełnić link do sekcji RN danego produktu-->
|v3                =
|v4                =<!--Jest wersja -> zamienić na: "version2=" i uzupełnić link do sekcji RN danego produktu-->
|v4                =
}}
}}


==Range of lesson==
==Project description==
''Sekcja uzupełniana ZAWSZE.''<br/>
The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.<br/>Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).<br/>Schema E - for the buildings with more than 5 floors (more than 12m in height).
* ''Pierwsze zdanie podaje jednoznaczny i krótki opis zakresu Zastosowania projektowego.''
* ''Dodatkowe zdanie stanowi informację uzupełniającą i informuje na bazie jakiego projektu / budynku przykład jest realizowany.''
==Modules and program configuration==
''SEKCJA OPCJONALNA.''<br/>
''wypunktowane potrzebne moduły do wykonania lekcji (zgodnie z [http://it.instalsoft.com/default.asp?W6936 Produkty handlowe])<br/>''


==Videos related to the article==
==Files to download and project information==
''SEKCJA OPCJONALNA. <br/>
===Schema A===
''Należy ją dodać do artykułu w sytuacji gdy w playlistach na naszym kanale youtube dostępny jest webinar o tematyce zgodnej z tematem lekcji. Treść sekcji:''<br/>
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
/link do filmu zgodnie z [[Template:Embed_video]]/<br clear="all"/>
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' can be made or not depending on the project features.<br/>[[File:Bypass ventilation schema A.png|900 px|left|thumb|1. Schema A.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_A.isproj Bypass ventilation Schema A, isproj]</br>
The videos present the topics described in this article, but they aren’t a recording of this lesson.
===Schema B===
* Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used as an ''<IS_TS id=EndOfSewerageLine/>'' for both stacks (''<IS_TS id=strKanalizacjaSanitarna/>'' and ''<IS_TS id=strKanalizacjaWentylacja/>'').<br/>[[File:Bypass ventilation schema B.png|900 px|left|thumb|2. Schema B.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_B.isproj Bypass ventilation Schema B, isproj]</br>
===Schema С===
* Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' are made automatically;
* Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.<br/>[[File:Bypass ventilation schema С.png|900 px|left|thumb|3. Schema C.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_C.isproj Bypass ventilation Schema C, isproj]</br>


==Project file==
===Schema D===
The project file used in this lesson: ''/link do właściwego artykułu PP/.''
* ''<IS_TS id=pinNameZaworOdpLubNapow/>'' is used on the first floor for the most distant fixture;
* ''<IS_TS id=iNameSanWentylacjaKanalizacji/>'' are connected to the sewage stack on the floors above.<br/>[[File:Bypass ventilation schema D.png |900 px|left|thumb|4. Schema D.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_D.isproj Bypass ventilation Schema D, isproj]</br>
===Schema E===
* In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
* The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' is declared as well;
* The connection of the additional stack to the main stack is made automatically by the means of a "vent loop". <br/>[[File:Bypass ventilation schema E.png |900 px|left|thumb|5. Schema E.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_E.isproj Bypass ventilation Schema E, isproj]
<!-- Do not write text below this tag -->


==Inital state==
<!--Specify the list of categories of commercial products, which the article concerns-->
''SEKCJA OPCJONALNA.''<br/>
* ''Opis od jakiego stanu projektu zaczynamy pracę.''
* ''Odniesienia do Zastosowań bazowych opisujących jak uzyskać stan początkowy, jeżeli takowe istnieją.''


==Steps to perform==
''SEKCJA OPCJONALNA.''<br/>
''W tej sekcji należy uzupełnić opis sekwencji kolejnych kroków prowadzących do efektu końcowego. <br/>
''W opisy kroków mogą zostać wplecione screeny obrazujące wykonywane czynności. Screeny muszą być czytelne i jednoznacznie wskazywać modyfikowane w projekcie miejsce, np. poprzez zaznaczenie elipsą.Screeny równamy to lewej strony, aby zachować odpowiednie wcięcie, poprzedzamy wstawienie screenu znakiem ":".''<br/>
''W kolejnych krokach powinny znaleźć się linki z referencjami do FUNKCJI I NARZĘDZI innych ZASTOSOWAŃ PROJEKTOWYCH zgodnie ze standardem: <br/>
<span style="color: cornflowerblue">Więcej na temat ''wstawiania grzejników, importowania podkładów, itp.'': ''link do zastosowania''.</span>.''<br/>
''Referencje do innych artykułów umieszczamy na końcu podpunktu, którego dotyczy, artykuły wymieniamy po dwukropku, w ciągu, oddzielone przecinkami.'' <br/>


===Nazwa kroku - do uzupełnienia jako tytuł podpunktu===
{|class="wikitable" style="width: 800px; margin: 0 auto;"
# ...
!If you have any comments on this article, please send us a short message at ''info@instalsoft.com''.
# ...
                 
# ...
|}


===Nazwa kroku - do uzupełnienia jako tytuł podpunktu===
[[Category:InstalSystem 5]]
# ...
[[Category:SAMPLE PROJECT]]
# ...
# ...


===Nazwa kroku - do uzupełnienia jako tytuł podpunktu===
<!-- Do not write text below this tag -->
# ...
<br class="iwlinks"/>[[pl:Kanalizacja grawitacyjna - wentylacja obejściowa|Kanalizacja grawitacyjna - wentylacja obejściowa]][[zh-cn:排水 - 通气管|排水 - 通气管]]
# ...
# ...
 
==Stan końcowy==
''Opcjonalnie: komentarz podsumowujący wykonaną lekcję.''
 
<!--Lista kategorii produktów handlowych, których artykuł dotyczy-->
<pre>[[Category:<podać kategorię z [[Categories]]>]]</pre>

Latest revision as of 14:28, 11 July 2025

Product InstalSystem 5
Type of article SAMPLE PROJECT
Source for translation 2024-06-10


Project description

The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).
Schema E - for the buildings with more than 5 floors (more than 12m in height).

Files to download and project information

Schema A

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
  • Generate intermediate ventilation connections can be made or not depending on the project features.
    1. Schema A.

    Bypass ventilation Schema A, isproj

Schema B

  • Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
  • Air admittance valve is used as an Element on top of stack for both stacks (Sanitary drainage and Ventilation conduit).
    2. Schema B.

    Bypass ventilation Schema B, isproj

Schema С

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
  • Generate intermediate ventilation connections are made automatically;
  • Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.
    3. Schema C.

    Bypass ventilation Schema C, isproj

Schema D

  • Air admittance valve is used on the first floor for the most distant fixture;
  • Drainage ventilating pipe-run are connected to the sewage stack on the floors above.
    4. Schema D.

    Bypass ventilation Schema D, isproj

Schema E

  • In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
  • The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
  • Generate intermediate ventilation connections is declared as well;
  • The connection of the additional stack to the main stack is made automatically by the means of a "vent loop".
    5. Schema E.

    Bypass ventilation Schema E, isproj


If you have any comments on this article, please send us a short message at info@instalsoft.com.